September 25, 2026Mumbai 3.0
When Will the Panvel–Karjat Rail Line Open?
The 29.6 km Panvel–Karjat rail corridor — tunnels and all 44 bridges done, commissioning expected through 2026 — links Karjat directly to Panvel and cuts 30 minutes.